The senate department for the State of Berlin jointly instructed Arcadis and Schüßler-Plan as a project committee to plan the traffic system, to provide technical planning services for the construction engineering works and to plan all temporary traffic systems and construction engineering works. In April 2018, the project committee commenced planning; construction is scheduled to begin in 2023.
Remodeling without stopping traffic
The remodeling work will be completed with the road open to traffic. The intersection will be designed for "free routing" to allow the heavy traffic to flow in the most effective way. The short exits and slip roads—which were built close together in the 1960s and are one of the causes of heavy congestion on the route—will be a thing of the past. Old bridges will be replaced, the removal of the Avus rest area will free up space and the Messedamm interchange will be rebuilt.